Costing - Set 6

यस पेजमा प्रश्न 31–40 (कुल 50 मध्ये)। विकल्पमा थिचेर उत्तर दिनुहोस् — सही/गलत तुरुन्तै देखिन्छ।

  • कुल प्रश्न50
  • यो पेजमा10 (31–40)
  • पृष्ठ4 / 5
  • परीक्षा समय30 मिनेट
  • जाँचतुरुन्तै
उत्तर 0/10✓ 0✗ 0
  1. 31. In a given scenario, if cost is considered as indirect cost then independent variable will be considered as

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: C. cost allocation base

  2. 32. To decide whether cost is variable cost or fixed cost with respect to some specific activity depends upon

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: C. time horizon

  3. 33. Cause and effect relationship between activity and costs is result of

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: D. all of these

  4. विज्ञापन
    विज्ञापन
  5. 34. For slope coefficient b, value of estimated coefficient is considered as

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: C. t-value

  6. 35. Learning curve models include

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: D. both a and b

  7. 36. Slope coefficient of linear cost function is

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: A. zero

  8. विज्ञापन
    विज्ञापन
  9. 37. Worse fit between estimated cost and actual observations is shown on regression line with

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: A. larger residual terms

  10. 38. Function which is used to measure decline in per unit cost of different business functions is classified as

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: B. experience curve

  11. 39. Work measurement method of cost estimation is also called

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: B. industrial engineering method

  12. विज्ञापन
    विज्ञापन
  13. 40. In quantitative analysis of estimating cost function, last and foremost step is to

    उत्तर हेर्नुहोस् (Show answer)

    सही उत्तर: B. evaluate cost driver

पृष्ठ 4 / 5 · प्रश्न 31–40 (कुल 50)

यही प्रश्नहरू टाइमरसहित क्विजको रूपमा दिनुहोस्30 मिनेट · नतिजा, Rank र विश्लेषणसहित
⏱ टाइमरसहित क्विज दिनुहोस् →
साथीलाई पठाउनुहोस्:FacebookWhatsAppTelegram
You cannot copy content of this page
SPONSORED • STICKY AD
SPONSORED • STICKY AD