Management AccountingMCQ प्रश्नोत्तर
Management Accounting - Set 6
यस पेजमा प्रश्न 21–30 (कुल 50 मध्ये)। विकल्पमा थिचेर उत्तर दिनुहोस् — सही/गलत तुरुन्तै देखिन्छ।
- कुल प्रश्न50
- यो पेजमा10 (21–30)
- पृष्ठ3 / 5
- परीक्षा समय30 मिनेट
- जाँचतुरुन्तै
21. Actual price of material is less than budgeted price, this means that
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: A. price variance is favourable
22. Budget which is planned around a single output level is called
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: C. static budget
23. Performance is evaluated only on basis of price variance, if performance evaluation is
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: A. positive
24. An efficiency variance is 200 units and actual input quantity is 500 units, then budgeted input quantity will be
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: A. 300 units
25. Difference between actual input variance and budgeted input variance is called
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: A. price variance
26. A costing system, which focuses on individual activities as particular cost object is classified as
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: A. activity based costing
27. Variance is stated difference between expected performance and the
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: B. actual results
28. If actual cost is $356000 and flexible budget cost is $255000, then flexible budget variance will be
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: C. $101,000
29. Quantity of input which is carefully determined is called
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: C. standard input
30. If budgeted input price is $50, price variance is $30 then an actual price will be
उत्तर हेर्नुहोस् (Show answer)
सही उत्तर: C. $80
पृष्ठ 3 / 5 · प्रश्न 21–30 (कुल 50)
यही प्रश्नहरू टाइमरसहित क्विजको रूपमा दिनुहोस्30 मिनेट · नतिजा, Rank र विश्लेषणसहित
⏱ टाइमरसहित क्विज दिनुहोस् →